Ventura County |
Code of Ordinances |
Division 12. Highway Encroachments |
Chapter 2. Application for and Issuance of Permits |
Appendix 12223. Permittee to pay for all costs.
The permittee is liable for and shall pay for all the Commissioner's costs related to the permit, including but not restricted to the following:
a.
The permit issuance fee if that has not otherwise been paid;
b.
Engineering, which includes design, inspection, survey, and tests;
c.
The cost of any inspection, transportation, or test made;
d.
The cost of repairing or restoring the highways and all appurtenant facilities to the same or equal condition that they were in before being cut or damaged as a result of the permittee's activities;
e.
The cost of furnishing and/or maintaining any lights, barricades or warning devices;
f.
The cost of alteration, removal, replacement, and/or repair to traffic signals and devices, the removal of temporary and/or permanent traffic stripes and any other expense for traffic control;
g.
The cost of removing or remedying any hazardous condition;
h.
The cost of tree trimming;
i.
Any other cost to the County caused by the permittee's activity.