Ventura County |
Code of Ordinances |
Division 8. Planning and Development |
Chapter 2. Subdivisions |
Article 6. Final Map And Parcel Map Requirements |
§ 8206-3.16. Separate map sheets.
Separate map sheets, in a form satisfactory to the County Surveyor and meeting the requirements of Section 66434.2 of the Subdivision Map Act, shall be submitted with the final map or parcel map and shall show the following information:
(a)
Unimproved natural watercourses wholly or partially within the proposed subdivision, and areas within the proposed subdivision that are subject to inundation or flood hazard;
(b)
All producing, abandoned or idle oil wells, all oil or gas pipelines, all existing or abandoned oil sumps, and all existing oil or gas conditional use permit boundaries;
(c)
The fault line or zone of each active or potentially active earthquake fault within the proposed subdivision that is identified in any soils and/or geologic report prepared specifically for the proposed subdivision;
(d)
Every building setback line or sewage disposal system setback line that is recommended in any archaeology report, soils and/or geologic report, prepared specifically for the proposed subdivision;
(e)
All conditions of approval of the tentative map that are to be satisfied after the final map or parcel map is recorded.