§ 8206-3.8. Water supply certificate.
When the proposed water supply is to be provided by anything other than individual wells on each lot, there shall be submitted with the final map or parcel map a water supply certificate, on a form provided by the County and signed by the proposed water supplier, certifying that:
(a)
Either of the following is true:
(1)
A binding agreement has been entered into between the owner of the land and the water supplier, enforceable by the owner and the owner's successors in interest to the land, providing, on terms substantially the same as those given the water supplier's customers generally, for the connection to the water supplier's system of each lot proposed to be served by the water supplier; or
(2)
Each lot proposed to be served by the water supplier will be served through an existing connection provided by the water supplier to the property; and
(b)
A civil engineer, registered by the State of California, has determined that:
(1)
The water supplier's system complies with the quality and quantity standards set forth in Title 22 of the California Code of Regulations and the connection of each proposed lot to such system will not cause any failure of such compliance; and
(2)
The facilities of the water supplier's system, including the installation to be made in the proposed subdivision, meet or exceed the requirements set forth in the applicable Ventura County Improvement Standards and Specifications; and
(c)
The portion of the improvement plans containing the design and specifications for subdivision sewer is satisfactory to the water supplier.