§ 8178-3.1.2.1. Initial evaluation.  


Latest version.
  • a.

    The Planning Division shall conduct a search of County records to determine if areas proposed to be disturbed, including but not limited to all building envelopes, access roads, subsurface structures, well sites, trenching sites, or other ground disturbance sites), have undergone a Phase I Inventory in accordance with Section 8178-3.1.2.2 (below).

    b.

    If a Phase I Inventory was conducted for the area proposed for development, the findings and recommendations shall be reviewed by the Planning Division to verify that all areas proposed for development were included in the Phase I Inventory.

    c.

    If the project area is undeveloped and no archaeological survey has been conducted, or portions of the project site were not included in a previous Phase I Inventory, the Planning Division shall contact the South Central Coast Information Center at Cal State Fullerton (SCCIC) to determine if a Phase I Inventory will be required.

(Ord. No. 4492, § 6, 6-21-2016)